• Baker Hughes Case Studies

    The GaugePro Echo Reamer Worked with Wired Drill Pipe to Enable Cost-effective, Reliable Well Placement

    Location: Norway

    Read more

    Wired Drill Pipe Telemetry & GyroTrakâ„¢ Gyro Utilized in Top Hole Section Drilling to Optimize Anti-Collision Management

    Location: North Sea

    Read more